电气自动化英文自我评价
电气自动化英文自我评价(精选7篇)
电气自动化英文自我评价 篇1In short, through a year of productive labor and technical learning, I thought and technically have been greatly improved and progress. That is, broaden the horizons, a wealth of knowledge, but also improve their management and operational level, the most important thing is for their own work in the future, to better completion of the task to lay a good foundation.
In the political and ideological aspects have also made great progress, I actively move closer to the party organization, through the cadre study, understanding of the social development of the new situation and new trends, deepened understanding and understanding of the Communist Party of China in the spirit of the 17th CPC National Congress Under the guidance of more efforts to achieve individual ideological progress and leap in the struggle more than.
Summed up the work of the past year, that there are many problems and shortcomings. In the future work, only the continuous careful summary, found deficiencies, correct shortcomings, individuals can get faster progress. I think I work well.
电气自动化英文自我评价 篇2At present, he works in the domestic and international famous steel enterprise engineering technology limited company (metallurgy grade A, civilian grade A), mainly engaged in the industry and the people electrical engineering project design work and the project manager work.
Mainly for the iron and steel metallurgy, such as rolling, steel, sintering, ironmaking, chemical and civil construction projects such as electrical design work, mainly involved in the design project are:
Large-scale sintering desulfurization project, domestic sewage treatment, waste acid treatment, chemical companies for power distribution system transformation, lime cellar frequency and control system transformation, a district police station and other industrial and civil project design work.Participate in the project both industrial electrical automatic control system design, and high and low voltage power supply and distribution systems, substations, transmission systems, residential, office buildings and other public construction projects electrical design.
Up to now, the company has completed more than 100 projects of large and small projects with more than 10 million yuan of investment, mainly in charge of department of electrical professional, chief engineer, registered electrical engineer and project manager.
电气自动化英文自我评价 篇3Graduated from Technical University of Electrical Engineering and Automation, outstanding academic performance during the school, has entered the tutor electrical automation laboratory for electrical component selection and functional testing, controller design and functional debugging, programming control and electrical systems Of intelligent control;
After graduation, the company entered the State Power Automation Co., Ltd., is responsible for product design and debugging, field equipment installation, commissioning and acceptance work for the hydropower station and power plants to provide monitoring equipment, proficient in the host computer and Under the machine system, various types of PLC and touch screen programming control; in the field during the service has repeatedly praised by customers, to work seriously responsible, good communication, coordination has a strong organizational skills and team spirit, lively and cheerful, optimistic progress; Motivated, diligent in learning can continue to improve their own ability and overall quality. In the future work, I will be full of energy, assiduously study the spirit to work hard and steadily improve their ability to work with the simultaneous development of enterprises.
电气自动化英文自我评价 篇4An excellent electrical engineer with 15 years of electrical work experience.To seek the position of electrical engineer, in order to give full play to 10 years of state-owned enterprises and five years of foreign engineers work accumulated by the rich professional knowledge and skills, including the design and review of electrical drawings, various industrial field automation control system installation and commissioning, Of the commercial negotiations and on-site installation commissioning and guidance, all kinds of imported equipment maintenance and maintenance.
I hope to be able to use my knowledge and accumulated work experience to better serve your company while maximizing the interests of the enterprise. During the project construction period or after the factory is put into operation, I hope to be an electrical engineer.
电气自动化英文自我评价 篇5Time is always footsteps, how long a year? Three hundred sixty-five sunrise, three hundred sixty-five sunset only, in the alternation of sunrise and sunset in the past, look back this year's work And life full and half at a loss.
This year I am still in Beidaihe sanatorium overall renovation project is responsible for electrical work. In the first half of the main construction, electrical construction to do with the civil pipe buried and ground lightning protection work, electrical project construction team is the local construction company in Qinhuangdao, construction quality and the quality of the construction team in Beijing is not the slightest difference, the local quality inspection Department requirements are too low, so the first half of my identity is another professional quality inspectors, for their strict requirements but also to provide their own learning opportunities, in order to convince others of course, there are good reasons, professional aspectsShould have a solid professional knowledge.
This project has a special case, close to the beach, the ground is hard rock, which encountered two situations, one, the seaside corrosion is particularly heavy, the original design of all used galvanized steel pipe and welded steel pipe, the general situation Under the two management is the most durable, but not applicable at the beach, whether galvanized pipe or welded steel pipe bare in the air not more than two weeks above the thin layer of corrosion is a layer of light touch It peeling off. Brush off the anti-rust paint had no effect. Project supervision to me when drawing this point, the beginning of half-doubt. In the design of the consent of the ground only part of the strong power to pvc pipe, concrete pipes are also used galvanized steel pipe, summer and a half months after the suspension, the site reserved for structural columns, steel pipe surface is a thick one Layer rust, I am surprised I secretly delighted: really do not listen to the old man made a loss in sight, the experience is really useful ah! Second, because the basis of the following are all rock, lightning effect is not good, the original design lightning protection grounding Practices fail to meet the requirements of the standard value, and other building foundation is not connected to the case can only fill the ground electrode or add resistance reduction agent.
Beidaihe due to the suspension of the project a month and a half, but also because of the renovation project we went to Shanghai. Shanghai is a bustling city, surging in the city is the latest fashion, her architecture has its own unique style, we have seen in Shanghai, known as the Bund Building known as the Bund buildings, a taste of the past Far East Wall Street wind color . Bank of China, Peace Hotel, Customs House, HSBC Bank & .. These buildings are not from the same designer hand, is not built in the same period, but their architectural tones basic unity, the overall contour processing surprising coordination, Whether it is overlooking or wander in the meantime can feel a vigorous and vigorous, elegant and imposing manner. The short trip makes me realize that their vision of the narrow, lack of knowledge, personal small, Jinmao Tower, the Pearl of the Orient really is out of reach?
The second half of my work is mainly responsible for the room electrical pipeline laying and power supply and distribution programs, electrical piping laying should be very simple, but because the program is not sure the drawings imperfect, my role constantly transform, live doing some powerless. But better be regarded as a test of their own right, more opportunities for more growth.
Originally thought that the power supply program will be a good run, the fact once again taught me a lesson: underestimate the enemy will be beaten.Shanghai's design with this can not be used in the Beidaihe area, no way everything from scratch, knowledge is learned in a setback. years of work, life in contact with more and more 80 or 80, to see them one by one in their respective fields to show their mettle, ambitious look, inner panic arises spontaneously.
电气自动化英文自我评价 篇6University for three years, shaping a healthy, confident I, self-confidence from the strength, but at the same time also realize that the rapid social change, the demand for talent is also growing, society is constantly changing, development, and to With the development of the eyes to see the problem, there are many shortcomings and deficiencies, to adapt to social development, have to constantly improve their understanding of ideas, improve themselves and correct shortcomings. As a it, the social pressure will be more heavy than other industries, to learn to learn, learn to innovate, learn to adapt to social development requirements. Time flies, is a four-year, four-year university campus and social practice of life, is a turning point in my life is a new starting line, a goal, there is the pursuit of success, there are failures and frustrations, the most important point, After this time of tempering, I grew up!
When I was in my freshman year, I listened to the training of my freshman education at school. When I learned that my ability and attitude were the main determinants, I learned, learned, read and accepted new things with my tireless mentality. Concept, active thinking. After four years, familiar with coreldraw, photoshop and other news professional editing software, cooledit, premiere and other audio and video software, in the next three years of school production completed dv drama "and cherish", master basic business ability, "Outstanding third - class students" scholarship, a "second - class scholarship outstanding students" and three "Miyoshi students" honorary title. Arrangement of professional at the same time, I also participated in the work of the school students, two and a half years, really let me benefit. From the initial news network to the subsequent office, I learned how to better team work, learn how to co-ordinate planning, how to organize and coordination, and so on, really pay when there is a sense of responsibility and mission, these gains Is unable to use money, honor and other material to measure the return. Work is both a pressure, but also a driving force in the busy, they will cherish the time to study harder. In organizational life, had the honor to participate in party school learning, through the layers of assessment, join the ranks of the Communist Party of China to prepare, improve their quality, quality, ability and ideological level.
After learning, practice and work life, I still strive to pursue: the completion of the day, Nissin high! Comprehensive evaluation of the students in the department:
The students adhere to the four basic principles, conscientiously study and implement the party's line, principles, policies; politically actively requested progress, submitted to the party organization to join the party application; actively participate in school organization activities; excellent. In business learning, the students work hard, correct attitude, good grades, have a strong time hands-on ability; master a certain basic knowledge and expertise. The students have strict organizational discipline, to comply with the school, department, class rules and regulations, usually strict demands on themselves, subject to management, respect for teachers, unite students, concerned about the collective.
University four years fleeting, look back on the past few years of college life and social practice of life, there are sweet and bitter, laughing and tearful, there are successes and failures. I tirelessly, with super fighting, and constantly challenge themselves and enrich themselves and hope for the future to join the community and lay a solid foundation for the realization of the value of life.
电气自动化英文自我评价 篇7In the four years of university study, I continue to challenge themselves, enrich themselves, advancing with the times, all-round development of their own should have the ability.
In the study, I earnestly study specialized courses, study hard, study achievement is outstanding, has won two first-class scholarship, a second scholarship, a third scholarship, also won the honorary title of outstanding students .Digual learning combined with social practice, With a strong ability to learn and analyze and deal with problems, in addition, the computer also has the basic knowledge, economics, business management and other related professional knowledge.
In thinking, I am aggressive, have a higher ideological consciousness, advancing with the times, concerned about national affairs.
In life, I am lively and cheerful, patient, optimistic, and often communicate with teachers, and students get along well, helpful, good at listening to others opinions, brainstorming, a strong sense of responsibility and good interpersonal relationships, A wide range of friends, have good communication skills.
I am interested in a wide range of expertise is the sprint, long-distance running, has won the 200-meter sprint the second place of success, in the school to join the Taekwondo Association, many times to participate in college leagues, and referees with the relevant knowledge and technology,And actively participate in a series of school activities, such as the athletic meet aerobics, new performances and a number of public fund-raising activities, etc., which not only makes me enhance physical fitness, but also makes me more strong and confident. I have learned a number of ways of doing things, have better organizational coordination, but also accumulated some experience for the future work laid the foundation.
I realized that I still have a lot to learn, so in the future I will be optimistic about the work and study, so that their more comprehensive development.
With a certain career development prospects, will help me improve the relevant professional skills, and core competitiveness of the professional positions.
电气自动化英文自我评价相关文章:
电气自动化英文自我评价
上一篇:入团的自我评价
下一篇:学生学校运动会自我评价1000字